I spent nineteen years pouring and finishing slabs before I picked up a moisture meter for a living instead of a bull float, and the first thing I look for on any Toowoomba job now is the same thing that used to keep me up at night as a concreter: the edge. Not the middle of the slab — the middle rarely moves much. It’s the perimeter, especially the corners, where I found a lift of nearly 15 mm on a house last month, enough that the skirting had pulled away from the tile line in a dead-straight gap you could slide a coin into.
Continue reading Slab Edges and Soil Movement: What Inspectors See in Toowoomba